5 July 2000 Test results of the VLTI Delay Line verification program
Harm Hogenhuis, Martijn Visser, Gustav Ruwiel, Frans Hommes, Arno Wielders, Arjan Couwenberg
Author Affiliations +
Abstract
The VLTI Delay Line verification program has been performed in the first quarter of the year 2000. This paper will present results from the measurements done at Fokker Space premises, supported by results from Matlab simulations. Key requirements are addressed, except for those which deal with the opto-mechanical verification. Jitter on the mechanical velocity and the OPD, as well as pupil stability and heat dissipation in the tunnel, have been driving requirements for the design and construction of the Delay Lines. The results which are presented below will demonstrate that these requirements are met with the `Two-Stage' concept chosen for the control of the commanded optical path trajectory.
© (2000) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Harm Hogenhuis, Martijn Visser, Gustav Ruwiel, Frans Hommes, Arno Wielders, and Arjan Couwenberg "Test results of the VLTI Delay Line verification program", Proc. SPIE 4006, Interferometry in Optical Astronomy, (5 July 2000); https://doi.org/10.1117/12.390209
Lens.org Logo
CITATIONS
Cited by 1 scholarly publication.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Control systems

Metrology

Actuators

Telecommunications

Space operations

Amplifiers

Atmospheric modeling

Back to Top