Paper
5 July 2016 Models for the active optics system of the ASTRI SST-2M prototype proposed for the Cherenkov Telescope Array
Author Affiliations +
Proceedings Volume 10012, Integrated Modeling of Complex Optomechanical Systems II; 1001207 (2016) https://doi.org/10.1117/12.2214548
Event: Integrated Modeling of Complex Optomechanical Systems II, 2015, Varenna, Italy
Abstract
ASTRI SST-2M is an end-to-end prototype of Small Size class of Telescope proposed for the Cherenkov Telescope Array (CTA). Currently under completion at the Serra La Nave observing station (Mt. Etna, Catania, Italy), the ASTRI SST- 2M telescope is the first imaging dual-mirror telescope ever realized for Cherenkov telescopes. A mini-array of nine such telescopes will form the ASTRI mini-array proposed as a precursor and initial seed of CTA to be installed at the final CTA southern site. ASTRI SST-2M is equipped with an active optics system, controlling both the segmented primary mirror and the monolithic secondary mirror, which allows optical re-alignment during telescope slew. We describe the hardware and software solution that have been implemented for optics control and the models we developed for the system.
© (2016) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Daniele Gardiol, Enrico Giro, Luigi Lessio, Davide Loreggia, Gabriele Rodeghiero, and Federico Russo "Models for the active optics system of the ASTRI SST-2M prototype proposed for the Cherenkov Telescope Array", Proc. SPIE 10012, Integrated Modeling of Complex Optomechanical Systems II, 1001207 (5 July 2016); https://doi.org/10.1117/12.2214548
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Atmospheric Cherenkov telescopes

Mirrors

Telescopes

Actuators

Image segmentation

Active optics

Prototyping

RELATED CONTENT

Active optics system of the ASTRI SST 2M prototype for...
Proceedings of SPIE (August 07 2014)
Large Binocular Telescope the control system of the position...
Proceedings of SPIE (September 18 1997)
LAMOST project and its current status
Proceedings of SPIE (February 04 2003)
Mirror support smart actuator
Proceedings of SPIE (June 08 1995)
Performance of the active M1 cell for the 2.1 m...
Proceedings of SPIE (August 25 1998)

Back to Top