27 July 2016 LSST summit facility construction progress report: reacting to design refinements and field conditions
Jeffrey D. Barr, William Gressler, Jacques Sebag, Jaime Seriche, Eduardo Serrano
Author Affiliations +
Abstract
The civil work, site infrastructure and buildings for the summit facility of the Large Synoptic Survey Telescope (LSST) are among the first major elements that need to be designed, bid and constructed to support the subsequent integration of the dome, telescope, optics, camera and supporting systems. As the contracts for those other major subsystems now move forward under the management of the LSST Telescope and Site (T and S) team, there has been inevitable and beneficial evolution in their designs, which has resulted in significant modifications to the facility and infrastructure. The earliest design requirements for the LSST summit facility were first documented in 2005, its contracted full design was initiated in 2010, and construction began in January, 2015. During that entire development period, and extending now roughly halfway through construction, there continue to be necessary modifications to the facility design resulting from the refinement of interfaces to other major elements of the LSST project and now, during construction, due to unanticipated field conditions. Changes from evolving interfaces have principally involved the telescope mount, the dome and mirror handling/coating facilities which have included significant variations in mass, dimensions, heat loads and anchorage conditions. Modifications related to field conditions have included specifying and testing alternative methods of excavation and contending with the lack of competent rock substrate where it was predicted to be. While these and other necessary changes are somewhat specific to the LSST project and site, they also exemplify inherent challenges related to the typical timeline for the design and construction of astronomical observatory support facilities relative to the overall development of the project.
© (2016) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Jeffrey D. Barr, William Gressler, Jacques Sebag, Jaime Seriche, and Eduardo Serrano "LSST summit facility construction progress report: reacting to design refinements and field conditions", Proc. SPIE 9906, Ground-based and Airborne Telescopes VI, 99060P (27 July 2016); https://doi.org/10.1117/12.2233383
Lens.org Logo
CITATIONS
Cited by 2 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Large Synoptic Survey Telescope

Telescopes

Buildings

Coating

Observatories

Optical instrument design

Optical instrument design

RELATED CONTENT

Baseline design of the LSST telescope mount assembly
Proceedings of SPIE (July 22 2014)
Final design of the LSST hexapods and rotator
Proceedings of SPIE (July 27 2016)
LSST telescope and site status
Proceedings of SPIE (July 27 2016)
Design of the Discovery Channel Telescope mount
Proceedings of SPIE (July 10 2008)
LSST Telescope mount and pier design overview
Proceedings of SPIE (July 28 2010)
Discovery Channel Telescope: progress and status
Proceedings of SPIE (June 27 2006)

Back to Top