Full Content is available to subscribers

Subscribe/Learn More  >
Proceedings Article

The Thirty-Meter Telescope project design and development phase

[+] Author Affiliations
Larry M. Stepp, Stephen E. Strom

AURA New Initiatives Office (USA)

Proc. SPIE 5382, Second Backaskog Workshop on Extremely Large Telescopes, 67 (July 7, 2004); doi:10.1117/12.566105
Text Size: A A A
From Conference Volume 5382

  • Second Backaskog Workshop on Extremely Large Telescopes
  • Arne L. Ardeberg; Torben Andersen
  • Backaskog, Sweden | September 09, 2003

abstract

The U.S. National Observatories have responded to the call of the astronomy decadal survey committee to develop a Giant Segmented Mirror Telescope by forming the AURA New Initiatives Office. Drawing on the engineering and scientific staffs of the National Optical Astronomy Observatory and the Gemini Observatory, NIO has for the past 30 months carried out studies aimed at: understanding the key science drivers for a thirty-meter telescope; developing a feasible point design that is responsive to the science goals; and identifying key technical issues that must be solved in order to successfully build such a telescope. In parallel, NIO has followed the charge of the decadal survey to identify potential private and international partners to fulfill the committee vision of a public-private partnership to build and operate this facility. NIO has now joined with two other groups -- the CELT Development Corporation (a partnership between the University of California and the California Institute of Technology) and the Association of Canadian Unviersities for Research In Astronomy (ACURA) -- to initiate the next step, the design & development (D & D) phase of a joint project that is being called the Thirty-Meter Telescope (TMT) Project. This paper reviews the plans for the TMT D & D phase, including the organizational structure, science requirements, and plans for conceptual design studies, technology development, and site selection.

© (2004) COPYRIGHT SPIE--The International Society for Optical Engineering. Downloading of the abstract is permitted for personal use only.
Citation

Larry M. Stepp and Stephen E. Strom
"The Thirty-Meter Telescope project design and development phase", Proc. SPIE 5382, Second Backaskog Workshop on Extremely Large Telescopes, 67 (July 7, 2004); doi:10.1117/12.566105; http://dx.doi.org/10.1117/12.566105


Access This Proceeding
Sign in or Create a personal account to Buy this proceeding ($15 for members, $18 for non-members).

Figures

Tables

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging & repositioning the boxes below.

Related Book Chapters

Topic Collections

Advertisement
  • Don't have an account?
  • Subscribe to the SPIE Digital Library
  • Create a FREE account to sign up for Digital Library content alerts and gain access to institutional subscriptions remotely.
Access This Proceeding
Sign in or Create a personal account to Buy this proceeding ($15 for members, $18 for non-members).
Access This Proceeding
Sign in or Create a personal account to Buy this article ($15 for members, $18 for non-members).
Access This Chapter

Access to SPIE eBooks is limited to subscribing institutions and is not available as part of a personal subscription. Print or electronic versions of individual SPIE books may be purchased via SPIE.org.