Presentation + Paper
10 July 2018 APEX beyond 2016: the evolution of an experiment into an efficient and productive Submillimeter Wavelength Observatory
Thomas Klein, Francisco M. Montenegro-Montes, Miroslaw Ciechanowicz, Claudio Agurto, Juan-Pablo Araneda, Oriel Arriagada, Francisco Azagra, Michael Cantzler, Mauricio Cárdenas, Patricio Caro, Michael Dumke, Edouard González, Christian Herrera, Felipe Mac-Auliffe, Rodrigo Parra, Juan Pablo Pérez-Beaupuits, Jorge Ramírez, Jorge Santana, Karl Torstensson, Paulina Venegas
Author Affiliations +
Abstract
The Atacama Pathfinder EXperiment (APEX) operates a 12m submillimeter wavelength telescope in the high Andes in Chile at 5107 m above sea level since 20061. Several steps have been taken to improve the operation efficiency of the facility in the given harsh environmental conditions2. The developments in remote control and -sensing allowed in 2017 for the transition to a remote science operations scheme, observing 24/7 from the basecamp control center in San Pedro de Atacama. Also engineering and maintenance is in the transition phase to a similar scheme to minimize presence and activities at the very high site. Instrument control servers allowing remote operation even of heterodyne THz instrumentation, with no compromise on instrument performance, had been developed and proven to reliably work3. The transition to full remote science operations required major hardware upgrades on the antenna drive system and a failsafe remote-control system to ensure the safety of the antenna, the Sun Avoidance System (SAS). We report on the layout, the implementation and on the experience of the first year of this new operations model started in April 2017.

The engineering tasks also are in a transition phase to a scheme that minimizes the presence at the antenna. Daily engineering work at the high site for preventive and corrective maintenance can be reduced when all critical hardware systems are integrated in a remote monitoring and control system. We have started with this in 2015 and have stepwise introduced this new scheme. This required the introduction of redundancies of systems as well as the extension of sensing points and remote-control interfaces, throughout all levels in the project breakdown structure of the telescope and its auxiliary systems. We present examples of theses implemented systems and discuss the concept of redundancies.

The APEX observatory is the smallest ESO site in Chile, incorporated as a department of LPO, the ESO La Silla – Paranal Observatory, within the directorate of Operations (DoO). The work presented will attempt an outline of approaches that can be applied to telescopes exposed to similar environmental conditions as well as to larger and distributed operations such as envisaged for the Paranal Observatory extended by the ELT on Cerro Armazones.
Conference Presentation
© (2018) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Thomas Klein, Francisco M. Montenegro-Montes, Miroslaw Ciechanowicz, Claudio Agurto, Juan-Pablo Araneda, Oriel Arriagada, Francisco Azagra, Michael Cantzler, Mauricio Cárdenas, Patricio Caro, Michael Dumke, Edouard González, Christian Herrera, Felipe Mac-Auliffe, Rodrigo Parra, Juan Pablo Pérez-Beaupuits, Jorge Ramírez, Jorge Santana, Karl Torstensson, and Paulina Venegas "APEX beyond 2016: the evolution of an experiment into an efficient and productive Submillimeter Wavelength Observatory", Proc. SPIE 10704, Observatory Operations: Strategies, Processes, and Systems VII, 107041V (10 July 2018); https://doi.org/10.1117/12.2312687
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Telescopes

Antennas

Control systems

Observatories

Sun

Failure analysis

Photonic integrated circuits

RELATED CONTENT

The Large Millimeter Telescope status
Proceedings of SPIE (February 04 2003)
The Large Millimeter Telescope
Proceedings of SPIE (July 10 2008)
Control system of the Portable Submillimeter Telescope (POST)
Proceedings of SPIE (December 13 2002)
APEX: five years of operations
Proceedings of SPIE (July 29 2010)

Back to Top