Abstract
The GRAVITY+ project includes the upgrade of the Very Large Telescope Interferometer infrastructure and of the instrument GRAVITY to improve sky coverage, high contrast capabilities, and faint science. The improved sky coverage is obtained via the implementation of one Laser Guide Star (LGS) on each Unit Telescope (UT). This first requires an upgrade of the infrastructure of each of the UTs, which was made over 18 months in 2022 and 2023. The addition of the LGS system requires the implementation of multiple components on several areas of the telescope. These areas include the top ring, the centerpiece, a new platform under the Nasmyth platform, and in the basement. The system includes pointing and aircraft avoidance cameras, the laser projector, laser and electronics cabinets, a heat exchanger, and pumps. As none of the UTs were developed with the infrastructure needed to carry such a system, the same upgrade is made for each of the three UTs. This upgrade consists of a full adaptation of the centerpiece, an upgrade of one of the altitude cable wraps, the installation of a platform under the Nasmyth platform, and the implementation of a cooling circuit running from the basement to the new sub-Nasmyth platform via the azimuth cable wrap. This upgrade requires two missions per telescope, for a total of 30 nights out of operation per telescope. The centerpiece activity also requires the removal of the M1 mirror and cell. The activities were therefore coordinated with the regular recoating of the M1 to minimize the number of nights out of operation. The upgrade required approximately 7.5 staff years of work and 36 missions from Europe to Chile, with around 60 people participating in at least one of the seven missions.
(2024) Published by SPIE. Downloading of the abstract is permitted for personal use only.
Michael Tucker Booth, Malte Scherbarth, Frédéric Gonté, Jose Antonio Abad, Bernardo Aguilera, Patricio Alarcon, Iván Alvarez, Luis Alvial, Eduardo Atton, Alexis Beltran, Israel Barraza, Pablo Barriga, Helen Bedigan, Christopher Binimelis, Oscar Briones, Rodrigo Candia, Luis Caniguante, Robin Capocci, Cesar Cardenas, Danissa Cardenas, Abdón Chala, Reinaldo Contreras, Ralf Conzelmann, Alain Delboulbé, Francoise Delplancke, Juan Diaz, Alejandro Doberti, Max Engelhardt, Jorge Fernandez, Eloy Fuenteseca, Fernando Garcia, Christian Garrido, Paul Garrido, Iván Guidolin, Pablo Gutierrez, Ronald Guzman, Wolfgang Hackenberg, Yerko Juica, Jean-Paul Kirchbauer, Demostenes Kirkmann, Peter Krempl, Juan Lorenzo, Alfredo Mella, Jhorvis Meza, Felipe Miranda, Sebastian Nunes, Sylvain Oberti, Francisco Olivares, Mario Opazo, Miguel Riquelme, Jordán Rivera, Miguel Robles, Fernando Salgado, Sylvain Rochat, Edson Rojas, Nicolas Schuler, Izzy Tambay, Richard Tamblay, Esteban Unmanzor, Herman Vega, Francisco Villanueva, Ricardo Whilem, Julien Woillez, Juan Zúñiga, and Luis Zúñiga "Infrastructure upgrade of Antu, Kueyen, and Melipal for the implementation of laser guide stars for the GRAVITY+ project", Proc. SPIE 13096, Ground-based and Airborne Instrumentation for Astronomy X, 130969A (18 July 2024); https://doi.org/10.1117/12.3020005
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Safety

Telescopes

Laser guide stars

Equipment

Mirrors

Astronomical interferometers

Large telescopes

RELATED CONTENT

Commissioning Kuntur: the LLAMA 690GHz receiver at JCMT
Proceedings of SPIE (August 16 2024)
Design of the laser beam transfer system for the new...
Proceedings of SPIE (August 29 2022)
Control software for honeycomb mirrors
Proceedings of SPIE (December 13 2020)
But I'm an engineer not a contracts...
Proceedings of SPIE (September 25 2012)

Back to Top