Paper
23 June 2006 Nulling at the Keck interferometer
Author Affiliations +
Abstract
The nulling mode of the Keck Interferometer is being commissioned at the Mauna Kea summit. The nuller combines the two Keck telescope apertures in a split-pupil mode to cancel the on-axis starlight and coherently detect the residual signal. The nuller, working at 10 um, is tightly integrated with the other interferometer subsystems including the fringe and angle trackers, the delay lines and laser metrology, and the real-time control system. Since first 10 um light in August 2004, the system integration is proceeding with increasing functionality and performance, leading to demonstration of a 100:1 on-sky null in 2005. That level of performance has now been extended to observations with longer coherent integration times. An overview of the overall system is presented, with emphasis on the observing sequence, phasing system, and differences with respect to the V2 system, along with a presentation of some recent engineering data.
© (2006) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
M. Mark Colavita, Gene Serabyn, Peter L. Wizinowich, and Rachel L. Akeson "Nulling at the Keck interferometer", Proc. SPIE 6268, Advances in Stellar Interferometry, 626803 (23 June 2006); https://doi.org/10.1117/12.672651
Lens.org Logo
CITATIONS
Cited by 14 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Nulling interferometry

Mirrors

Interferometers

Stars

Calibration

Telescopes

Metrology

RELATED CONTENT

PRIMA for the VLTI: a status report
Proceedings of SPIE (June 27 2006)
Keck interferometer update
Proceedings of SPIE (February 21 2003)
Visibility science operations with the Keck Interferometer
Proceedings of SPIE (October 20 2004)
Recent progress at the Keck Interferometer
Proceedings of SPIE (June 27 2006)
The PRIMA Astrometric Planet Search project
Proceedings of SPIE (October 20 2004)
Keck Interferometer status and plans
Proceedings of SPIE (October 20 2004)

Back to Top