13 September 2012 Long-term performance of the VISIR/VLT instrument before the upgrade
Danuta Dobrzycka, Yazan Momany, Lars Lundin, Ralf Siebenmorgen, Hans U. Käufl, Alain Smette, Florian Kerber, Mario Van Den Ancker
Author Affiliations +
Abstract
The ESO's VLT Spectrometer and Imager for the Mid-Infrared (VISIR) has been in operation at the Paranal Observatory since 2005. It is equipped with two DRS (formerly Boeing) 256 × 256 BIB arrays. The project to replace detectors into new Raytheon, 1k × 1k AQUARIUS devices as well as to modify observing modes, software, etc. is underway. The VISIR upgrade creates a well defined break point in the instruments' characteristics. For nearly 7 years of the VISIR operations we have been collecting and processing calibration data, in particular observations of the imaging and spectroscopic standard stars, within a regular data flow operation scheme. The derived quality control parameters have been systematically written into a database, which allows the analysis of their temporal behavior. We present an overview of the long term variations of the VISIR quality control parameters: sensitivity, conversion factor and mean background level estimations. The results will be later used to compare performance of VISIR before and after the upgrade.
© (2012) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Danuta Dobrzycka, Yazan Momany, Lars Lundin, Ralf Siebenmorgen, Hans U. Käufl, Alain Smette, Florian Kerber, and Mario Van Den Ancker "Long-term performance of the VISIR/VLT instrument before the upgrade", Proc. SPIE 8448, Observatory Operations: Strategies, Processes, and Systems IV, 84481P (13 September 2012); https://doi.org/10.1117/12.925348
Lens.org Logo
CITATIONS
Cited by 1 scholarly publication.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Stars

Spectroscopy

Sensors

Calibration

Digital filtering

Imaging systems

Mid-IR

RELATED CONTENT

VISIR upgrade overview and status
Proceedings of SPIE (July 31 2014)
Lessons learned from VISIR
Proceedings of SPIE (July 09 2008)
New measures in controlling quality of VLT VISIR
Proceedings of SPIE (July 12 2008)
VISIR upgrade overview and status
Proceedings of SPIE (September 27 2012)

Back to Top