KEYWORDS: Observatories, Telescopes, Artificial intelligence, Systems modeling, Data modeling, Astronomy, Control systems, Databases, Advanced process control, Automatic control, Automation, Facility engineering, Data transmission
The Observatorio Astrofísico de Javalambre (OAJ†1 ) in Spain is a young astronomical facility, conceived and developed from the beginning as a fully automated observatory with the main goal of optimizing the processes in the scientific and general operation of the Observatory. The OAJ has been particularly conceived for carrying out large sky surveys with two unprecedented telescopes of unusually large fields of view: the JST/T250, a 2.55 m telescope of 3 deg field of view, and the JAST/T80, an 83 cm telescope of 2 deg field of view. The most immediate objective of the two telescopes for the next years is carrying out two unique photometric surveys of several thousand square degrees, J-PAS†2 and J-PLUS†3 , each of them with a wide range of scientific applications, like e.g. large structure cosmology and Dark Energy, galaxy evolution, supernovae, Milky Way structure, exoplanets, among many others. To do that, JST and JAST are equipped with panoramic cameras deployed within the J-PAS collaboration, JPCam and T80Cam respectively, which make use of large format (~ 10k x 10k) CCDs covering the entire focal plane. The first part of this paper elaborates on the organizational advantages realized through the incorporation of Enterprise Resource Planning (ERP) and Computerized Maintenance Management System (CMMS) in our operations. These administrative tools offer a coherent framework for workforce optimization, reducing operational costs, and achieving scientific objectives while maintaining stringent quality standards. Central to this strategy is the employment of a common inventory structure to facilitate seamless interdepartmental processes. The second section explores how emerging technologies, specifically Artificial Intelligence (AI), are integral in achieving a harmonized global framework. AI models and algorithms are instrumental in optimizing various facets of the observatory's operations, thereby furnishing the project with essential high-quality tools for success. This multi-faceted approach not only meets but exceeds operational and scientific targets within budgetary constraints, setting a benchmark for observatory operational efficiency and performance.
First scientific operation and performances of the Javalambre Panoramic Camera (JPCam) are presented in this paper. JPCam, deployed on the 2.6m large field-of-view Javalambre Survey Telescope (JST250) at the Observatorio Astrof´ısico de Javalambre (OAJ), is a 1.2 Gpixel camera conceived to perform the Javalambre Physics of the Accelerated Universe Astrophysical Survey (J-PAS). J-PAS in an unprecedented photometric sky survey of several thousand square degrees of the northern sky in 56 optical bands, 54 of them narrow-band filters (145 Å FWHM). The innovative designs of the J-PAS instrument and filter system has been optimized to accurately measure photometric redshifts for galaxies up to z∼1 and to study stellar populations in nearby galaxies. As a result, J-PAS will provide a low-resolution spectroscopy for hundreds of millions of other galaxies. The data set produced by this survey will have a unique legacy value, allowing a wide range of astrophysical studies. To this aim, JPCam is equipped with a mosaic of 14 large format 9.2k x 9.2k, 10μm pixel, low noise detectors from Teledyne-E2V, providing an unvignetted Field of View of 3.4 square degrees with a plate scale of 0.2267′′/pix. Its filter unit admits 5 filter trays, each mounting 14 filters corresponding to the 14 CCDs of the mosaic and allowing all the J-PAS filters to be permanently installed. To optimize image quality during the observations, the position of the JST250 secondary mirror and JPCam focal plane are maintained optically aligned by means of two hexapod systems. To perform this task, JPCam includes 12 auxiliary detectors, 4 for autoguiding and 8 for image quality control through wavefront sensing. JPCam commissioning was successfully completed and first scientific operation started in summer 2023. This paper shows JPCam on-sky operation and first J-PAS Science Verification results, demonstrating fulfilment of the main J-PAS scientific requirements.
Access to the requested content is limited to institutions that have purchased or subscribe to SPIE eBooks.
You are receiving this notice because your organization may not have SPIE eBooks access.*
*Shibboleth/Open Athens users─please
sign in
to access your institution's subscriptions.
To obtain this item, you may purchase the complete book in print or electronic format on
SPIE.org.
INSTITUTIONAL Select your institution to access the SPIE Digital Library.
PERSONAL Sign in with your SPIE account to access your personal subscriptions or to use specific features such as save to my library, sign up for alerts, save searches, etc.