Paper
28 September 2022 Study on intelligentize excavation technology in CHENGKAI tunnel
Yu Wang, Tianrong Huang, Jiao Zhang, Xiaoping Du, Qingming Zhang
Author Affiliations +
Proceedings Volume 12339, Second International Conference on Cloud Computing and Mechatronic Engineering (I3CME 2022); 123391V (2022) https://doi.org/10.1117/12.2655040
Event: Second International Conference on Cloud Computing and Mechatronic Engineering (I3CME 2022), 2022, Chendu, China
Abstract
In order to effectively reduce the construction accidents caused by water gushing in karst tunnel, the bad geological position, nature, occurrence and size in front of the excavation face of karst tunnel can be predicted by means of drilling method, geophysical exploration method and other technical means. Through innovation and practice in concrete projects, this paper puts forward a set of advanced and systematic construction technology in karst tunnels, which has achieved good economic and social benefits. This construction method combines geophysical exploration and drilling, and organically combines the detection characteristics of different equipment, so that the advanced prediction work in complex situations is more systematic, refined and accurate.
© (2022) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Yu Wang, Tianrong Huang, Jiao Zhang, Xiaoping Du, and Qingming Zhang "Study on intelligentize excavation technology in CHENGKAI tunnel", Proc. SPIE 12339, Second International Conference on Cloud Computing and Mechatronic Engineering (I3CME 2022), 123391V (28 September 2022); https://doi.org/10.1117/12.2655040
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Electromagnetism

Sensors

Magnetism

Radar

Advanced radar

Distance measurement

General packet radio service

Back to Top