Baiu season is the most important precipitation period to the climate of east China. It is often raining day after day with mixed type of precipitation over large area and lasting almost one month. The estimation of 3hr mean areal precipitation over SHIGUANHE catchment during Baiu season by use of GMS IR technique is present here. For getting better estimation of heavy rain, a multilayer feed-forward Artificial Neural Network (ANN) is introduced by training sample pairs of TRMM PR radar and GMS image on raining points and simulating the network in a relative small area nearby and short time span. Parts of raining points estimated by GMS IR method are modified by the output of the network according to data quality. Case studies over one or three consecutive swaths of PR show that the standard deviations of rainfall estimation increase after heavy rain modification while the correlation coefficients between rainfalls estimated and measured by ground based radar keep almost the same before and after data correction.
Access to the requested content is limited to institutions that have purchased or subscribe to SPIE eBooks.
You are receiving this notice because your organization may not have SPIE eBooks access.*
*Shibboleth/Open Athens users─please
sign in
to access your institution's subscriptions.
To obtain this item, you may purchase the complete book in print or electronic format on
SPIE.org.
INSTITUTIONAL Select your institution to access the SPIE Digital Library.
PERSONAL Sign in with your SPIE account to access your personal subscriptions or to use specific features such as save to my library, sign up for alerts, save searches, etc.