In this paper, we describe the wide-field spectroscopic survey telescope (WST) project. WST is a 12-metre wide-field spectroscopic survey telescope with simultaneous operation of a large field-of-view (3 sq. degree), high-multiplex (20,000) multi-object spectrograph (MOS), with both a low and high-resolution modes, and a giant 3×3 arcmin2 integral field spectrograph (IFS). In scientific capability, these specifications place WST far ahead of existing and planned facilities. In only 5 years of operation, the MOS would target 250 million galaxies and 25 million stars at low spectral resolution, plus 2 million stars at high resolution. Without need for pre-imaged targets, the IFS would deliver 4 billion spectra offering many serendipitous discoveries. Given the current investment in deep imaging surveys and noting the diagnostic power of spectroscopy, WST will fill a crucial gap in astronomical capability and work in synergy with future ground and space-based facilities. We show how it can address outstanding scientific questions in the areas of cosmology; galaxy assembly, evolution, and enrichment, including our own Milky Way; the origin of stars and planets; and time domain and multi-messenger astrophysics. WST’s uniquely rich dataset may yield unforeseen discoveries in many of these areas. The telescope and instruments are designed as an integrated system and will mostly use existing technology, with the aim to minimise the carbon footprint and environmental impact. We will propose WST as the next European Southern Observatory (ESO) project after completion of the 39-metre ELT.
Publisher's Note: This paper, originally published on 18 July 2024, was replaced with a corrected/revised version on 30 August 2024. If you downloaded the original PDF but are unable to access the revision, please contact SPIE Digital Library Customer Service for assistance.
BlueMUSE is a blue-optimised, medium spectral resolution, panoramic integral eld spectrograph under development for the Very Large Telescope (VLT). With an optimised transmission down to 350 nm, spectral resolution of R~3500 on average across the wavelength range, and a large FoV (1 arcmin2), BlueMUSE will open up a new range of galactic and extragalactic science cases facilitated by its specific capabilities. The BlueMUSE consortium includes 9 institutes located in 7 countries and is led by the Centre de Recherche Astrophysique de Lyon (CRAL). The BlueMUSE project development is currently in Phase A, with an expected rst light at the VLT in 2031. We introduce here the Top Level Requirements (TLRs) derived from the main science cases, and then present an overview of the BlueMUSE system and its subsystems ful lling these TLRs. We speci cally emphasize the tradeo s that are made and the key distinctions compared to the MUSE instrument, upon which the system architecture is built.
In the era of Extremely Large Telescopes, the current generation of 8-10m facilities are likely to remain competitive at ground-UV wavelengths for the foreseeable future. The Cassegrain U-Band Efficient Spectrograph (CUBES) has been designed to provide high instrumental efficiency ( > 37%) observations in the near UV (305-400 nm requirement, 300-420 nm goal) at a spectral resolving power of R > 20, 000 (with a lower-resolution, sky-limited mode of R ∼ 7, 000). With the design focusing on maximizing the instrument throughput (ensuring a Signal to Noise Ratio – SNR– ∼ 20 per spectral resolution element at 313 nm for U ∼ 17.5 mag objects in 1h of observations), it will offer new possibilities in many fields of astrophysics: i) access to key lines of stellar spectra (e.g. lighter elements, in particular Beryllium), extragalactic studies (e.g. circumgalactic medium of distant galaxies, cosmic UV background) and follow-up of explosive transients. We present the CUBES instrument design, currently in Phase-C and approaching the final design review, summarizing the hardware architecture and interfaces between the different subsystems as well as the relevant technical requirements. We describe the optical, mechanical, electrical design of the different subsystems (from the telescope adapter and support structure, through the main opto-mechanical path, including calibration unit, detector devices and cryostat control, main control electronics), detailing peculiar instrument functions like the Active Flexure Compensation (AFC). Furthermore, we outline the AIT/V concept and the main instrument operations giving an overview of its software ecosystem. Installation at the VLT is planned for 2028/2029 and first science operations in late 2029.
KEYWORDS: Spectrographs, Stars, Chemical elements, Ultraviolet radiation, Telescopes, Galactic astronomy, Sensors, Astronomy, Signal to noise ratio, Near ultraviolet
In the era of Extremely Large Telescopes, the current generation of 8-10m facilities are likely to remain competitive at ground-UV wavelengths for the foreseeable future. The Cassegrain U-Band Efficient Spectrograph (CUBES) has been designed to provide high-efficiency (> 40%) observations in the near UV (305-400 nm requirement, 300-420 nm goal) at a spectral resolving power of R >20, 000 (with a lower-resolution, sky-limited mode of R ~7, 000). With the design focusing on maximizing the instrument throughput (ensuring a Signal to Noise Ratio (SNR) ~20 per high-resolution element at 313 nm for U ~18.5 mag objects in 1h of observations), it will offer new possibilities in many fields of astrophysics, providing access to key lines of stellar spectra: a tremendous diversity of iron-peak and heavy elements, lighter elements (in particular Beryllium) and light-element molecules (CO, CN, OH), as well as Balmer lines and the Balmer jump (particularly important for young stellar objects). The UV range is also critical in extragalactic studies: the circumgalactic medium of distant galaxies, the contribution of different types of sources to the cosmic UV background, the measurement of H2 and primordial Deuterium in a regime of relatively transparent intergalactic medium, and follow-up of explosive transients. The CUBES project completed a Phase A conceptual design in June 2021 and has now entered the detailed design and construction phase. First science operations are planned for 2028.
Access to the requested content is limited to institutions that have purchased or subscribe to SPIE eBooks.
You are receiving this notice because your organization may not have SPIE eBooks access.*
*Shibboleth/Open Athens users─please
sign in
to access your institution's subscriptions.
To obtain this item, you may purchase the complete book in print or electronic format on
SPIE.org.
INSTITUTIONAL Select your institution to access the SPIE Digital Library.
PERSONAL Sign in with your SPIE account to access your personal subscriptions or to use specific features such as save to my library, sign up for alerts, save searches, etc.